Active heave compensation of floating wind turbine installation using a catamaran construction vessel

Abstract

The application of floating wind turbines is limited by the high cost that increases with the water depth. Offshore installation and maintenance continue to consume a high percentage of the project budget. To improve the installation efficiency of the floating offshore wind turbine, a novel concept is proposed by the SFI MOVE project. Several wind turbine superstructure components are preassembled onshore and carried to the installation site by …