Earthquake-Induced Damage Assessment of Segmental Post-tensioned Precast Concrete Bridge Pier
Abstract
Traffic disruptions and downtime due to bridge repair or replacement can cause significant socioeconomic losses. ‘Accelerated Bridge Construction’ (ABC) can minimize the impact of bridge construction on roadside safety by reducing the duration of on-site projects. Precast concrete bridge elements and systems have been recognized as key technology of ABC. However, they are significantly under-utilized in seismicity areas for bridge …