Journal article
An inexact optimization model for regional electric system steady operation management considering integrated renewable resources
Abstract
In this study, an inexact two-stage stochastic fuzzy programming (ITSFP) is developed for regional power generation planning with considering the intermittency and fuzziness of renewable energy power output. ITSFP incorporates interval-parameter programming (IPP), two-stage stochastic programming (TSP), and fuzzy credibility constrained programming (FCCP) within a general optimization framework which can tackle uncertainties expressed as …
Authors
Zhen JL; Huang GH; Li W; Liu ZP; Wu CB
Journal
Energy, Vol. 135, , pp. 195–209
Publisher
Elsevier
Publication Date
9 2017
DOI
10.1016/j.energy.2017.06.053
ISSN
0360-5442