Journal article
Planning of Electric Power Systems Considering Virtual Power Plants with Dispatchable Loads Included: An Inexact Two‐Stage Stochastic Linear Programming Model
Abstract
In this study, an inexact two-stage stochastic linear programming (ITSLP) method is proposed for supporting sustainable management of electric power system under uncertainties. Methods of interval-parameter programming and two-stage stochastic programming were incorporated to tackle uncertainties expressed as interval values and probability distributions. The dispatchable loads are integrated into the framework of the virtual power plants, and …
Authors
Zhou C; Huang G; Chen J
Journal
Mathematical Problems in Engineering, Vol. 2018, No. 1, pp. 1–12
Publisher
Hindawi
Publication Date
August 30, 2018
DOI
10.1155/2018/7049329
ISSN
1024-123X