Journal article
Study on impact of variables to pavement preheating operation in HIR by using FEM
Abstract
Hot In-place Recycling (HIR) is an innovative pavement maintenance and rehabilitation technology that can reuse up to 100% of the material from an existing pavement as Reclaimed Asphalt Pavement (RAP). Pre-heating the pavement is the first step in the HIR process and uniformly heating distressed pavement is crucial to the quality of the recycled mixture in terms of rejuvenator diffusion, required adhesion between virgin and old material, and …
Authors
Liu Y; Wang H; Tighe S; Pickel D; You Z
Journal
Construction and Building Materials, Vol. 243, ,
Publisher
Elsevier
Publication Date
May 2020
DOI
10.1016/j.conbuildmat.2020.118304
ISSN
0950-0618