Experts has a new look! Let us know what you think of the updates.

Provide feedback
Home
Scholarly Works
Level schedules for mixed-model JIT production...
Journal article

Level schedules for mixed-model JIT production lines: characteristics of the largest instances that can be solved optimally

Abstract

Takt time and cycle time are design variables in JIT production. Actual production is a performance variable. The level production scheduling problem constructs a schedule that matches actual production to takt time and cycle time. The problem can be solved optimally by constructing a network of nodes and arcs in which each path through the network corresponds to a production schedule and the shortest path corresponds to the optimal level …

Authors

Miltenburg J

Journal

International Journal of Production Research, Vol. 45, No. 16, pp. 3555–3577

Publisher

Taylor & Francis

Publication Date

August 15, 2007

DOI

10.1080/00207540701223394

ISSN

0020-7543

Labels