Conference
Stamping Blank Optimal Layout and Coil Slitting Widths for Single and Multiple Blanks
Abstract
In stamping, operating costs are dominated by raw material costs, which can typically reach 75 percent of total costs in a stamping facility. In this paper, material utilization efficiency is modeled by considering two primary sources of scrap: material cut away from the exterior of each blank on the strip and off-cuts of unusable narrow strips generated when wide master coils are slit into strips for subsequent stamping. Based on these, layout …
Authors
Nye TJ
Volume
123
Pagination
pp. 482-488
Publisher
ASME International
Publication Date
October 1, 2001
DOI
10.1115/1.1395020
Conference proceedings
Journal of Engineering Materials and Technology
Issue
4
ISSN
0094-4289