Conference
Production aspects of a large blast furnace
Abstract
No.8 Blast Furnace (3800 m3) at WISCO began production in 2009. Since then, the quality of iron ores charged to the furnace has gradually declined and a series of measures have been taken in order to ensure that productivity and economic considerations are successfully maintained. As a result, the coal gas utilization rate has increased to 49.5%, process parameters have been optimized, and an ironmaking operation with high productivity and low …
Authors
Song Z; Lu Z; Barati M; Yang Y; McLean A
Volume
1
Pagination
pp. 413-420
Publication Date
January 1, 2017
Conference proceedings
Aistech Iron and Steel Technology Conference Proceedings
ISSN
1551-6997