Journal article
A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
Abstract
A dynamic programming procedure for determining the optimal just-in-time (JIT) production schedule for a mixed-model facility is presented. Compared to previously available optimization methods it substantially reduces computation and storage requirements, enabling practical-sized problems to be solved. However, there are still difficulties for solving very large problems. Heuristics, which have been proposed for these large problems, can now …
Authors
Miltenburg J; Steiner G; Yeomans S
Journal
Mathematical and Computer Modelling, Vol. 13, No. 3, pp. 57–66
Publisher
Elsevier
Publication Date
1990
DOI
10.1016/0895-7177(90)90370-3
ISSN
0895-7177