Experts has a new look! Let us know what you think of the updates.

Provide feedback
Home
Scholarly Works
One‐sided Control Charts Based on Precedence and...
Journal article

One‐sided Control Charts Based on Precedence and Weighted Precedence Statistics

Abstract

In this paper, we study one‐sided control charts based on precedence statistics. Because we focus on the problem of detecting ‘smaller’ lifetime than expected, we consider only one‐sided control charts that have not received much attention in the literature. Alarm rate and average run length are derived when the process is in control and also when the process is out of control for two Lehmann alternatives. On the basis of the alarm rate and …

Authors

Balakrishnan N; Paroissin C; Turlot J

Journal

Quality and Reliability Engineering International, Vol. 31, No. 1, pp. 113–134

Publisher

Wiley

Publication Date

February 2015

DOI

10.1002/qre.1750

ISSN

0748-8017