Journal article
Variance of the number of units produced on a transfer line with buffer inventories during a period of length T
Abstract
The transfer‐line models in the literature are planning models rather than operational models. That is, they are very useful for planning or designing the transfer line, but are less useful for controlling the daily operation of the line. The performance measure used in these models is the efficiency of the line A. The expected number of units produced during a period of length T cycles is AT. In this article a procedure is presented for …
Authors
Miltenburg GJ
Journal
Naval Research Logistics, Vol. 34, No. 6, pp. 811–822
Publisher
Wiley
Publication Date
December 1987
DOI
10.1002/1520-6750(198712)34:6<811::aid-nav3220340606>3.0.co;2-z
ISSN
0894-069X