Home
Scholarly Works
Scheduling mixed-model multi-level just-in-time...
Journal article

Scheduling mixed-model multi-level just-in-time production systems

Abstract

Many companies are converting their mixed-model multi-level production systems to just-in-time systems. This requires reducing set-up times so that small-lot production can be run. In this paper a theoretical basis is developed for scheduling these systems, and scheduling algorithms and heuristics are developed. The only other known scheduling method (the goal-chasing method), developed and used by Toyota, is shown to be a special case of these heuristics.

Authors

MILTENBURG J; SINNAMON G

Journal

International Journal of Production Research, Vol. 27, No. 9, pp. 1487–1509

Publisher

Taylor & Francis

Publication Date

January 1, 1989

DOI

10.1080/00207548908942636

ISSN

0020-7543

Labels

Contact the Experts team