Home
Scholarly Works
Dynamic manufacturing scheduling using both...
Journal article

Dynamic manufacturing scheduling using both functional and resource related agents

Abstract

Manufacturing scheduling is a difficult problem, particularly when it takes place in an open and dynamic environment. Agent-based technology has recently been used in attempts to resolve this problem. A bidding mechanism based on Contract Net protocol is often proposed as a key solution component. Our approach is to use both functional and physical resource related agents, and combine a bidding mechanism based on Contract Net protocol with a mediation mechanism based on Mediator architecture for realizing dynamic manufacturing scheduling and rescheduling. A machine-centered scheduling mechanism and related concepts and mechanisms are described, and a prototype implementation is presented.

Authors

Shen W; Norrie DH

Journal

Integrated Computer-Aided Engineering, Vol. 8, No. 1, pp. 17–30

Publisher

SAGE Publications

Publication Date

January 3, 2001

DOI

10.3233/ica-2001-8102

ISSN

1069-2509

Contact the Experts team