Journal article
Process optimization via constraints adaptation
Abstract
In the framework of real-time optimization, measurement-based schemes have been developed to deal with plant-model mismatch and process variations. These schemes differ in how the feedback information from the plant is used to adapt the inputs. A recent idea therein is to use the feedback information to adapt the constraints of the optimization problem instead of updating the model parameters. These methods are based on the observation that, …
Authors
Chachuat B; Marchetti A; Bonvin D
Journal
Journal of Process Control, Vol. 18, No. 3-4, pp. 244–257
Publisher
Elsevier
Publication Date
3 2008
DOI
10.1016/j.jprocont.2007.07.001
ISSN
0959-1524