Benefits from process control: results of a joint industry-university study
Abstract
A key component of any process control upgrade project is the initial benefits analysis. This analysis defines the correct scope of the project based on the plant's economics, production requirements and capacity, and equipment capacity. The scope must be defined to correctly determine the process units and controls included in the project, design the control strategies, specify the equipment required, plan the engineering aspects and develop a …